Weather protection · OP-R1—OP-R4

Keep the courtsin play.

Weather protection solutions for year-round padel court operation. Four roof formats create different levels of sun, rain and perimeter protection for individual and multi-court projects.

01 / 04OP-R1 Canopy Roof system over a blue padel court

OP-R1 · Open-sided protection

Canopy RoofRoof canopy · Open perimeter

Protection matched to the project

From a single canopy
to a moving roof.

Onto Padel roof systems offer sun and rain protection with multiple roof options for different court projects. Start with the level of coverage and operating flexibility you need; the final structural specification is then coordinated around the site.

01 · Roof products

Four levels
of protection.

Open a system to review its application, coverage, dimensions, membrane, hardware and finish.

02 · Side-by-side

Compare the
starting formats.

These specifications describe the standard systems. Foundations, structural loads and local compliance are reviewed against the specific project location.

System guideOP-R1Canopy RoofOP-R2Semi-Enclosed RoofOP-R3Fully-Enclosed RoofOP-R4Electric Retractable Roof
ApplicationSingle-court and independent padel projectsIndividual courts requiring additional perimeter coverageMulti-court padel facilities · Recommended for 2+ courtsMulti-court padel facilities · Recommended for 2+ courts
CoverageRoof canopy · Open perimeterRoof canopy · Upper side coverageRoof membrane · Lower 3 m side enclosureMotorized retractable membrane
Center height8.5 m8.5 m8.5 m9 m
Side height6 m6 m6 m8 m
Column height6 m6 m6 m6 m
Roof fabric750 g/m² double-sided blackout PVC-coated membrane750 g/m² double-sided blackout PVC-coated membraneDouble-sided opaque PVC knife-coated fabric650 g/m² covering membrane
Surface treatmentZinc-rich powder coating / optional hot-dip galvanizingZinc-rich powder coating / optional hot-dip galvanizingZinc-rich powder coating / optional hot-dip galvanizingPre-galvanized steel tubing with standard paint coating

Swipe horizontally to compare all four systems.

03 · Before quotation

A roof starts
with the site.

Roof dimensions and structural requirements cannot be separated from the local environment. Share these inputs so the proposal can be developed around the real project.

01

Site & layout

Project city, court count, site drawings and available structure footprint.

02

Local conditions

Indoor or outdoor use, climate, wind requirements and applicable local standards.

03

Operating brief

Required coverage, preferred opening strategy and target installation schedule.

Your weather-protection brief

Plan the roof
with the courts.

Tell us the city, court count, site conditions and preferred level of enclosure. We will recommend a roof starting point and define the next technical information required.

Request a roof proposal
One coordinated brief,court + roof.