Side-rain protection
The fixed membrane extends below the roofline to help screen rain approaching from the sides.

Extended weather protection · Roof system
OP-R2
A fixed roof with upper side cladding and an open lower 3 m. It helps screen side rain while preserving natural ventilation around the court.
From $65 USD/m²

01 · System intent
OP-R2 combines overhead coverage with fixed upper side cladding. The lower 3 m remain open, allowing air to move through the venue while the upper enclosure helps shelter the courts from wind-driven rain.
The fixed membrane extends below the roofline to help screen rain approaching from the sides.
The lower 3 m remain open for access, airflow and visual connection.
304 stainless-steel bolts and chemical anchors form the standard fixing package.

Coverage strategy
The selected roof format establishes the starting coverage and operating concept. Final structure, foundations and connection details are then coordinated with the court layout, local conditions and applicable project requirements.
02 · Technical details
The details below outline the OP-R2 starting specification. Project-specific engineering and compliance requirements are confirmed before production.
Starting prices are in USD/m², not a total project quotation. Final scope and pricing are confirmed with your site brief.
03 · Project coordination
A roof proposal needs more than a product name. These three inputs allow the team to review fit, scope and the next engineering steps.
Project city, court count, site drawings and available structure footprint.
Indoor or outdoor use, climate, wind requirements and applicable local standards.
Required coverage, preferred opening strategy and target installation schedule.
Continue exploring

Roof canopy · Open perimeter
From $50 USD/m²

Roof membrane · Lower 3 m side enclosure
From $75 USD/m²

Open-front canopy with open lower sides
From $45 USD/m²

Folding membrane above an elevated frame
From $50 USD/m²
Specify OP-R2
Share your project location, court count, site drawings and target schedule. We will confirm whether OP-R2 fits the brief and prepare the next-stage proposal.