OP—R3Fully-Enclosed Roof

Multi-court enclosure · Roof system

OP-R3

Fully-Enclosed Roof

A fully enclosed roof concept for multi-court facilities, combining an opaque roof membrane with a zip-closed lower side enclosure.

ApplicationMulti-court padel facilities · Recommended for 2+ courts
OP—R3OP-R3 Fully-Enclosed Roof building envelope
Coverage
Roof membrane · Lower 3 m side enclosure
Center height
8.5 m
Column height
6 m

01 · System intent

A sheltered envelope for larger facilities

OP-R3 creates a more complete venue envelope for projects with two or more courts, bringing the roof and lower perimeter into one coordinated membrane system.

01

Multi-court format

Recommended for facilities planned around two or more padel courts.

02

Lower enclosure

PVC knife-coated side fabric encloses the lower 3 m of the structure.

03

Serviceable closure

Zipper closure is specified for the side-fabric system.

OP-R3 Fully-Enclosed Roof building envelope
OP-R3 · Roof membrane · Lower 3 m side enclosure

Coverage strategy

Protection,
defined clearly.

The selected roof format establishes the starting coverage and operating concept. Final structure, foundations and connection details are then coordinated with the court layout, local conditions and applicable project requirements.

02 · Technical details

Standard system
specification.

The values below describe the standard OP-R3 configuration. Project-specific engineering and compliance requirements are confirmed before production.

Application
Multi-court padel facilities, recommended for 2+ courts
Center height
8.5 m
Side height
6 m
Column height
6 m
Roof fabric
Double-sided opaque PVC knife-coated fabric
Side fabric
PVC knife-coated fabric with zipper closure, lower 3 m enclosure
Hardware
304 stainless steel / hot-dip galvanized bolts and chemical anchors
Surface treatment
Zinc-rich powder coating / optional hot-dip galvanizing

03 · Project coordination

Specify it around
the real site.

A roof proposal needs more than a product name. These three inputs allow the team to review fit, scope and the next engineering steps.

01

Site & layout

Project city, court count, site drawings and available structure footprint.

02

Local conditions

Indoor or outdoor use, climate, wind requirements and applicable local standards.

03

Operating brief

Required coverage, preferred opening strategy and target installation schedule.

Continue exploring

Other roof systems.

Compare all four

Specify OP-R3

Put the roof
into your project.

Share your project location, court count, site drawings and target schedule. We will confirm whether OP-R3 fits the brief and prepare the next-stage proposal.

Request this roof
Weather protection,planned with purpose.